01Scope of automation
Five tasks at a time, with a draft analysis for each batch
Why: Small batches keep each output reviewable. A smaller scope was also easier to prove.
Trade-off: End-to-end automation of the whole report
Case 02 · AI product · MedTech · Pilot · Human-in-the-loop · 4 min read
Problem statement
A local AI assistant helps engineers draft usability analyses, with human approval at every step.
Problem
Medical-device usability work involves documenting hundreds of tasks. Preparing initial analyses and reports consumes time that engineers could spend evaluating the device.
Issue
Device context matters, and plausible AI output can be wrong. Faster drafting is useful only when engineers can check, correct and approve the result.
Solution
A local Llama assistant prepares usability analyses five tasks at a time. Engineers review every output. A pilot with four to five engineers reduced analysis and drafting time by about 50%.
Progress About 50% less analysis and drafting time in a 4–5 engineer pilot.
Problem
Usability engineers document hundreds of device tasks. Repetitive drafting takes time away from analysis.
Users
Goals and metrics
The claim is deliberately narrow: faster drafting and analysis for specific activities, not a shorter medical device development or reporting timeline.
Solution
A local Llama model drafted usability analyses five tasks at a time, guided by IEC 62366. Engineers corrected and approved every output.
Decisions and trade-offs
Five tasks at a time, with a draft analysis for each batch
Why: Small batches keep each output reviewable. A smaller scope was also easier to prove.
Trade-off: End-to-end automation of the whole report
Engineers review, correct and manually approve every output
Why: In medical device engineering, errors cannot be accepted without verification. Review is a product requirement, not a workaround.
Trade-off: Some of the speed
Working examples and a prototype first, then a pilot with a small group
Why: Engineers had to trust it before an internal project relied on it.
Trade-off: A faster, wider rollout
Pilot findings
Results
| Measure | Result |
|---|---|
| Analysis and report drafting time | About 50% lower |
| Pilot participants | 4 to 5 engineers |
| Where the gain came from | Faster preparation of initial analyses. Engineers still reviewed, corrected and approved everything |
| What is not claimed | That the whole development or reporting timeline was halved |
The reduction applies to analysis and drafting, not the full development timeline.
Successor
The pilot informed a separate successor using RAG and enterprise-protected AI.
Additional accuracy and time gains have not been measured.
What I learned